This market offering several routes to market for the portfolio, which is why it is one of our preferred markets in our business plan.
Learn about our presence in this market and how we are contributing to accelerate the much needed energy transition.
- Load more
Key figures
Installed capacity
Generation
Offshore
Latest News
EDP Renewables secures its first stand-alone battery storage project in Europe
EDPR enters the UK onshore market with a 544 MW wind and solar portfolio
Balnacraig
- Technology: Battery Energy Storage System (BESS)
- Location: On land adjacent to Alness substation, the Highlands, Scotland
- Capacity: 49.9MW / 99.8MWh (2 hours system)
- Development status: Consented
- Start of Construction: 2024
- COD: Q4 2025
Harrington Franklin
- Technology: Battery Energy Storage System (BESS)
- Location:Kent, England
- Capacity: 49.9MW / 99.8MWh (2 hours system)
- Development status: Consented
- Start of Construction: 2024
- COD: Q4 2025
Lurg Hill
- Technology: Onshore Wind
- Location: Moray, Scotland
- Capacity: 14.4 MW
- Development status: Consented
- Start of Construction: 2026
- COD: 2026-2027
Ben Sca
- Technology: Onshore Wind
- Location: Skye, Scotland
- Capacity: 37.8MW
- Development status: Consented
- Start of Construction: 2027
- COD: 2028
- CfD/ Subsidy: CfD AR5
Balmeanach
- Technology: Onshore Wind
- Location: Skye, Scotland
- Capacity: 45MW
- Development status: In development
- Start of Construction: 2028
- COD: 2029
Cairds Hill
- Technology: Onshore Wind
- Location: Moray, Scotland
- Capacity: 16.8MW
- Development status: In development
- Start of Construction: 2026
- COD: 2026-2027
Drummarnock
- Technology: Onshore Wind
- Location: Stirling, Scotland
- Capacity: 30 MW
- Development status: In development
- Start of Construction: 2026
- COD: 2027
Moorshield
- Technology: Onshore Wind
- Location: Newton Mearns, Scotland
- Capacity: 18 MW
- Development status: Consented
- Start of Construction: 2026
- COD: 2027
Mynydd Bedwellte
- Technology: Onshore Wind
- Location: Tredegar, Wales
- Capacity: 54.9 MW
- Development status: In development
- Start of Construction: 2028
- COD: 2029
Muirake
- Technology: Onshore Wind
- Location: Aberdeenshire (Scotland)
- Capacity:4.6 MW
- Development status: In operation
- COD: 2012
EDPR companies in the UK, including Kronos Solar companies, follow EDPR’s Tax Strategy and the provisions of paragraph 19(2) and paragraphs 22(2) of Schedule 19 Finance Act 2016. Please, refer to https://www.edpr.com/en/sustainability/economic-dimension#tax-policy
For more details, click here.
Work with us
EDPR operates in 28 international markets and our growth over the past years has been supported by our employees’ flexibility and team work and their ability to adapt to a changing business.
We aim to be a long-term market leader in the renewable energy sector, pursuing credibility through value creation, social responsibility, safety, innovation and respect for the environment.
What makes us proud as an employer?
- TOP Employer Europe 2023 certification, including in Poland;
- Bloomberg Gender Equality Index 2022;
- Top Workplaces US 2022;
- Certification in Conciliation (Excellence) by the Más Familia Foundation.
EDPR undertakes to maintain a relationship of proximity with the local communities engaging in regular and open dialogue, seeking to know their needs, respecting their cultural integrity and looking to contribute to improve the living conditions of local population, taking measures to consider and respect the community interests.