EDP Renováveis opens its doors to UNED university  students on June 28, welcoming them to the Cerros de Radona wind farm in Medinaceli (Soria).

The students, from all over Spain (Madrid, Cataluña, Cantabria,)  spent the day at one of the most modern EDPR wind farms in Spain, which uses General Electric 2.5-MW wind turbines. The aim of this visit was to show how a wind farm works.

The visit was part of a calendar of visits to wind farms that the Communication department has scheduled for 2013 to improve relations with different interest groups and promote brand visibility and knowledge about the operation of wind farms.